Project Will include:
- Addition of curb and gutter to remove the third lane
- Evaluation of street lighting
- Striping and signage
- Drainage improvements
- Landscaping
- ADA ramps
- New sidewalk
- New crosswalks with signals
This project was budgeted to address safety concerns at the West 92nd Avenue intersections between Eaton Street and Ingalls Street, and safety and mobility improvements along Harlan Street.
The plan for the improvements will make the fourth westbound 92nd Avenue lane become a “right lane must turn right” at Eaton Street from the U.S. 36 overpass. The fourth westbound traffic lane on West 92nd Avenue between Eaton Street and Westminster Boulevard will be removed. The third westbound lane will then become the “right lane must turn right” at Westminster Boulevard.
Between Westminster Boulevard and Ingalls Street, the current acceleration lane will be removed and become a right turn only at Ingalls Street. By removing these lanes, the crossing distance for left turning vehicles from Ingalls Street will be reduced.
The asphalt resurfacing project along Harlan Street was scheduled to repair the worn and damaged pavement along Harlan including any damages done to the road due to construction traffic. This project also include sidewalk improvements and a new lane configuration to include bike lanes and on-street parking along Harlan Street.
Timeline:
Construction on West 92nd
Avenue was completed in October 2021. W. 92nd Ave. is scheduled to
be resurfaced as part of normal maintenance through Sheridan Blvd. as part of
the 2022 pavement program. Construction on Harlan street will finish with a resurfacing
to be completed beginning summer 2022. All construction of is project is anticipated
to be complete by October 2022.
Information/Questions:
For questions or comments, please call or email the city’s Project Manager Aaron Kirchner at 303-658-2143 or akirchner@westminsterco.gov.
92nd Avenue Safety Improvements Project Map