Department of Public Works and Utilities crews will be proactively repairing sections of sewer pipe at the locations below to prevent more costly emergency repairs in the future and make sure you can keep flushing your toilet without it backing up.
Thank you for your patience while we invest in our community.
2023 Locations
- West 120th Avenue between Huron Street and I-25
- West 100th Avenue and Countryside Drive- Internal pipe repair
- West 112th Avenue and Sheridan Boulevard- Internal pipe repair
- West 102nd Avenue and Sheridan Boulevard
What to expect if this work takes place on your street
- The city will notify you door-to-door prior to work starting.
- Once notified, please make sure to pour water down drains not frequently used to prevent sewer smells.
- No parking signs may be posted in the project area.
- You will see and hear construction activity during normal working hours, 7 a.m. to 5 p.m., Monday through Friday.
- Work outside these hours may be required if emergency repairs are needed.
- Work may require street closures, but local traffic will always be permitted if you live on the street.
- Materials, such as pipes and gravel, may be stored in the public right-of-way near the construction site.
- Repairs may take one to five business days to complete.
- No impacts to your water or sewer service are anticipated.
- If digging was required, a temporary street patch may be installed before final paving takes place at a later date.